Construction method using Bouyer Leroux:
|
![]() |
Preparing the bed for the
1st course with a
HOURDEX mortar |
![]() |
![]() |
![]() |
Positioning a column block over the reinforcing rods in the slab and checking the level of the course. |
|||
![]() |
![]() |
![]() |
| Spreading mortar on the blocks with the 20cm mortar roller |
BGV blocks can be cut with an axe or with an alligator saw. | |
Layering the 2nd Course |
Lintel Blocks. |
Intersecting load bearing wall |
![]() |
A possible beam and block floor construction using Level Blocks on the BGV course, Edge Blocks towards the exterior. The internal cavity will contain insulation. In a concrete floor construction the slab is placed over lintel blocks. A 5cm insulation is placed between the Edge block and the edge of the concrete slab. |